Record the problems you want resolved
Start with a short record of how the driveway works today. Photograph uneven sections, visible repairs, difficult transitions, and places where water collects. Include wide views that show the house, garage, street, and adjacent walkways. Close-ups alone may leave out relationships a contractor needs to assess.
Write down what you want the replacement to change. You may need clearer parking space, a smoother connection to a walkway, or a different appearance. Separate these goals from assumptions about the cause. A site assessment should help determine which work addresses the observed problem.
Define the replacement boundaries
Walk the property with the contractor and identify the exact area included in the proposal. Discuss the driveway apron, garage entrance, side paths, borders, and any section you plan to retain. Mark these boundaries on a drawing or annotated photograph that can accompany the written scope.
Ask how gates, irrigation, landscape beds, drains, and nearby surfaces affect the work. If a feature must be moved or repaired, identify who handles it. Avoid leaving the connection between the new driveway and the surrounding property to an informal conversation.
Ask about what lies below
The visible surface is only part of the replacement. FHWA pavement guidance discusses supporting layers and underlying site conditions. For a property owner, the practical question is how the contractor will assess and prepare the area supporting the new surface.
Ask what the proposal assumes about existing conditions and what removal may reveal. Request an explanation of how additional work would be documented and approved. The contractor should distinguish preparation already included from work that would require a revised scope. Keep that distinction in writing.
Walk through the drainage approach
Show where water collects and how conditions change after rain. Ask where the proposed driveway will direct water and how that approach relates to the garage, house, neighboring surfaces, and existing drainage features. FHWA addresses drainage as a design subject rather than a surface finish.
Do not treat a different material as a complete drainage plan. If a permeable option is proposed, EPA guidance provides general background on that type of system. Ask why it suits the site, what supporting work it requires, and how its care differs from alternatives.
Plan access during the work
Describe the access your household needs while the driveway is unavailable. Include vehicles, deliveries, pedestrians, mobility needs, pets, and utility equipment. Ask the contractor to explain the sequence and the conditions for reopening each area.
- Where vehicles can park with permission.
- Which entrance household members will use.
- How deliveries will reach the property.
- Who communicates changes to the work sequence.
- How questions or unexpected conditions are reported.
Review the scope before agreeing
Read the proposal with your photographs and boundary drawing beside it. Confirm that removal, disposal, preparation, the chosen surface, transitions, and drainage work appear explicitly. Check whether adjoining landscape or walkway repairs are included.
Ask for unclear terms to be explained and recorded. Identify the contact for scope changes, the process for approving additional work, and the documents provided at completion. Before work starts, both parties should share the same written understanding of the area, the work, and the access plan.